6
Speed
7
Cornering
6
Jumps
3
Lane Change
4
Braking
90-degree hairpin corner
Standard straight section
Quarter-length straight section (5-lane only, 1.5m)
45° banked curve. Place 2 banks with corners/straights between them. Extreme banking with severe transition clearance demands.
Sharp inverted-V ridge on straight (JC2024+) - 1 tall triangular peak per piece launches car aggressively, demanding strong dampers and brakes
Half-length straight section (5-lane only, 3.0m)
Spiral ramp - 90° corner pieces on gradually rising supports. Each piece gains ~75mm elevation. Combines cornering with climbing.
Long slope ramp up - 375mm rise over ~1800mm (3 straight pieces), 12° angle. Taller than standard slope, used in community 5-lane events.
Steep ~28° descent with a mid-slope step (5-lane competition section). The car accelerates downhill, then launches from the step into the receiver.
Lane change section. 3-lane: bridge overpass. 5-lane: flat crossover with steep ramp.